Zone 3- 75th Street, Sheridan Avenue to Xerxes Avenue

(Updated 12/17/2010)

Work Completed

  • Sanitary sewer interceptor pipe from Sheridan to Xerxes Avenue.
  • Flow Splitter Structure poured at Xerxes Avenue.
  • Storm sewer work from Sheridan to Xerxes Avenue.
  • Watermain work from Sheridan to Xerxes Avenue.
  • curb and gutter and driveway aprong replacement along 75th Street from Sheridan Avenue to Humboldt Avenue.
  • Final wear of the roadway has been placed from Sheridan Avenue to Xerxes Avenue.
  • The trail has been placed along 75th Street from Sheridan Avenue to Upton Avenue.
  • Final restoration work from Sheridan Avenue to Upton Avenue with the exception of the new fences.

Work in Progress:

  • Undergrounding of all private utilities along 75th Street from Upton Avenue to Xerxes Avenue.
  • Utility pole removal along 75th Street from Upton Avenue to Xerxes Avenue.

Work to be Completed in the Spring of 2011:

  • Trail to be placed along 75th Street from Upton Avenue to Xerxes Avenue.
  • Repair of driveway crossings on the north side of 75th Street from Upton Avenue to Xerxes Avenue.
  • Repair/Replaement of fences along 75th Street from Sheridan Avenue to Upton Avenue.
  • Tree plantings from Sheridan Avenue to Xerxes Avenue.
  • Final restoration work from Upton Avenue to Xerxes Avenue
  • Final punch-list items along 75th Street from Sheridan Avenue to Xerxes Avenue (replacement of cracked concrete, placement of signs, etc.)

(Updated 9/24/2010)

Work Completed:

  • Sanitary sewer interceptor pipe from Sheridan to Washburn Avenue.
  • Flow Splitter Structure poured at Xerxes Avenue.
  • Storm Sewer work to Vincent Avenue.
  • Watermain work completed to Vincent Avenue.

Work in Progress:

  • Sanitary interceptor crew from Washburn to Xerxes Avenue.
  • Storm Sewer work at Vincent Avenue
  • Watermain work at Vincent/Washburn Avenues.
  • Street grading work.

(Updated 9/2/2010)

Work Completed:

  • Sanitary sewer interceptor pipe from Sheridan Avenue through Thomas Avenue
  • Flow splitter structure poured at Xerxes Avenue.

Work in Progress:

  • Watermain work at Sheridan and Thomas Avenue
  • Storm sewer work at Sheridan and Thomas Avenue
  • Flow splitter structure at Xerxes Avenue 45-day cure process.

Stormwater Videos

A Drop In The Bucket
Good Water Gone Bad

Stormwatch

Construction Sites


Richfield Forestry is associated with these professional forestry organizations:

International Society of ArboricultureISA Logo White

Minnesota Society of Arboriculture

Arbor Day Foundation arbordayfoundation logo

Minnesota Shade Tree Advocate

University of Minnesota - Forestry

Emerald Ash Borer Information

Minnesota DNR - Forestry

MNTREES.ORG

US Forest Service

Minnesota Department of Agriculture

Trees Are Good treesaregood

 Copy of members staff C copy

 

 

  

 






Home   Webmaster   Contact   Search  
Site Powered by Revize    Login